PJM-AH2-345
120 MW generation in Lorain, OH · In queue since March 2022 · Proposed COD March 2025
120 MW
Capacity
1
Components
Solar
4y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
3 years
Schedule
14 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-03-07
PJM-AH2-345 is a proposed 120 MW solar generation project located in Lorain County, Ohio. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 10, 2022, with a proposed commercial operation date of March 7, 2025. The interconnecting utility is ATSI.
The interconnection agreement (IA) status for the project is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Wellington 138 kV substation.
Generated from interconnection queue and public data sources
State
OH
County
Lorain
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
Wellington 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- WELNGTDP230 KV TX1LD
- POI Substation
- Wellington Delivery Point
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH2-345