PJM-AH2-346
47.5 MW hybrid in Hancock, OH · In queue since March 2022 · Proposed COD March 2025
47.5 MW
Capacity
1
Components
Solar
4y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
3 years
Schedule
14 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-03-07
PJM-AH2-346 is a proposed 47.5 MW hybrid solar and battery project located in Hancock County, Ohio. The project, which consists of 47.5 MW of solar capacity, is interconnected within the PJM Interconnection queue. The queue entry date is March 10, 2022, with a proposed commercial operation date of March 7, 2025. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)".
The proposed project is located within the AEP utility service area.
Generated from interconnection queue and public data sources
State
OH
County
Hancock
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
East Arlington 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH2-346