Project PJM-AH2-369 — Project Summary

Queue ID
PJM-AH2-369
Capacity
16 MW
Technology
Solar
Status
active
Location
Fayette, WV
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH2-369

PJM-AH2-369BetaActiveSolarPJMLBNL + Live

16 MW generation in Fayette, WV · In queue since March 2022 · Proposed COD December 2025

16 MW

Capacity

1

Components

Solar

4y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 9m

Schedule

5 months past proposed COD

In Study38%
Queue EntryMar 11, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-01

About

PJM-AH2-369 is a proposed solar generation project located in Fayette County, West Virginia. The project, with a total capacity of 16 MW, is interconnected to the PJM Interconnection queue. The queue entry date is March 11, 2022, and the proposed commercial operation date is December 1, 2025. The interconnection agreement status is currently listed as "In Progress (unknown study)". The point of interconnection is the Nuttall 138 kV substation, and the interconnecting utility is AEP.

The development project consists of 16 MW of solar photovoltaic generation. It is currently listed as an active project within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

WV

County

Fayette

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Nuttall 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
NUTTALL 69 KV SUMMHYD

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.