Project PJM-AH2-378A — Project Summary

Queue ID
PJM-AH2-378A
Capacity
200 MW
Technology
Battery
Status
active
Location
Gloucester, NJ
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AH2-378A

PJM-AH2-378ABetaActiveBatteryPJMLBNL + Live

200 MW storage in Gloucester, NJ · In queue since March 2022 · Proposed COD December 2025

200 MW

Capacity

1

Components

Battery

4y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 9m

Schedule

4 months past proposed COD

In Study38%
Queue EntryMar 10, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-31

About

PJM-AH2-378A is a proposed 200 MW battery storage project located in Gloucester County, New Jersey. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 10, 2022. The proposed commercial operation date is December 31, 2025.

The interconnection agreement for the project with utility AEC is currently in progress, with the specific study status unknown. The point of interconnection is the Monroe 138kV substation. The project is currently listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

NJ

County

Gloucester

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEC

Entity

PJM

Service Type

Point of Interconnection

Monroe 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
MONR AE 230 KV LOADDUM
POI Substation
Monroe Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AH2-378A