28.3 MW generation in Worcester, MD · In queue since March 2022 · Proposed COD March 2026
28.3 MW
Capacity
1
Components
Solar
4y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
4 years
Schedule
2 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-03-01
PJM-AH2-379 is a proposed solar generation project with a total capacity of 28.3 MW, located in Worcester County, Maryland. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 10, 2022. The proposed commercial operation date is March 1, 2026.
The interconnection agreement status for PJM-AH2-379 is currently "In Progress (unknown study)". The interconnecting utility is Delmarva Power & Light (DPL), and the point of interconnection is the Sign Post - Stockton 69 kV substation. The project is currently listed as active within the PJM queue.
Generated from interconnection queue and public data sources
State
MD
County
Worcester
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
DPL
Entity
PJM
Service Type
—
Point of Interconnection
Sign Post - Stockton 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH2-379