PJM-AH2-403
83.284 MW generation in Cambria, PA · In queue since March 2022 · Proposed COD December 2028
83.284 MW
Capacity
1
Components
Wind
4y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2028
Total Duration
6y 9m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-31
PJM-AH2-403 is a proposed wind generation project located in Cambria County, Pennsylvania, within the PJM Interconnection region. The project, with a total capacity of 83.28 MW, consists entirely of wind generation. The queue entry date is March 10, 2022, with a proposed commercial operation date of December 31, 2028.
The project is interconnected with PENELEC at the Krayn 115 kV point of interconnection. Its interconnection agreement status is listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
PA
County
Cambria
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
Krayn 115 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- KRAYN 34.5 KV HIGHNOWF
- POI Substation
- Krayn Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH2-403