PJM-AH2-411
30 MW hybrid in KY · In queue since March 2022 · Proposed COD June 2025
30 MW
Capacity
1
Components
Solar
4y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
3y 3m
Schedule
11 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-06-01
PJM-AH2-411 is a proposed 30 MW hybrid solar and battery project located in Kentucky within the PJM Interconnection region. The development project, consisting of 30 MW of solar capacity, entered the PJM queue on March 10, 2022, with a proposed commercial operation date of June 1, 2025. The interconnecting utility is East Kentucky Power Cooperative (EKPC).
The project's interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the New Castle 69 kV substation. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
KY
County
—
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
New Castle 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- New Castle Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AH2-411