Project PJM-AI1-022 — Project Summary

Queue ID
PJM-AI1-022
Capacity
450 MW
Technology
Battery
Status
active
Location
Huntington, IN
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI1-022

PJM-AI1-022BetaActiveBatteryPJMLBNL + Live

450 MW storage in Huntington, IN · In queue since April 2022 · Proposed COD December 2026

450 MW

Capacity

1

Components

Battery

4y 1m

In Queue

In Progress (unknown study)

IA Status

COD target: 2026

Interconnection

Total Duration

4y 8m

In Study38%
Queue EntryApr 1, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-15

About

PJM-AI1-022 is a proposed battery storage project located in Huntington County, Indiana, within the PJM Interconnection region. The project, with a total capacity of 450 MW, consists entirely of battery storage. American Electric Power (AEP) is the utility associated with the project.

The project entered the PJM interconnection queue on April 1, 2022, with a proposed commercial operation date of December 15, 2026. Its interconnection agreement status is currently listed as "In Progress (unknown study)". The point of interconnection is the Sorenson 345 kV substation.

Generated from interconnection queue and public data sources

Project Details

State

IN

County

Huntington

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Sorenson 345 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
SORENSON138 KV T4
POI Substation
Indiana Michigan Power/AEP 345kV-765kV Sorenson Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.