PJM-AI1-075
11.9 MW generation in Lee, IL · In queue since July 2022 · Proposed COD September 2022
11.9 MW
Capacity
1
Components
Wind
3y 10m
In Queue
In Progress (unknown study)
IA Status
COD target: 2022
Total Duration
2 months
Schedule
45 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-09-01
PJM-AI1-075 is a proposed 11.9 MW wind generation project located in Lee County, Illinois. The project is interconnected within the PJM Interconnection queue, having entered the queue on July 6, 2022. The proposed commercial operation date is September 1, 2022. The interconnection agreement status is currently listed as "In Progress (unknown study)".
The proposed project is located within the ComEd utility territory. The point of interconnection is the Lee Co. EC 345kV substation. The developer is not specified in the data.
Generated from interconnection queue and public data sources
State
IL
County
Lee
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Lee Co. EC 345kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AI1-075