Project PJM-AI1-114 — Project Summary

Queue ID
PJM-AI1-114
Capacity
9.9 MW
Technology
Solar+Battery
Status
active
Location
Cambria, PA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI1-114

PJM-AI1-114BetaActiveSolarBatteryPJMLBNL + Live

9.9 MW hybrid in Cambria, PA · In queue since September 2022 · Proposed COD December 2025

9.9 MW

Capacity

1

Components

Solar

3y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 3m

Schedule

4 months past proposed COD

In Study38%
Queue EntrySep 2, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-31

About

PJM-AI1-114 is a proposed 9.9 MW hybrid solar and battery project located in Cambria County, Pennsylvania. The project, consisting of 9.9 MW of solar generation, is in the PJM interconnection queue as of September 2, 2022, with a proposed commercial operation date of December 31, 2025. The interconnecting utility is PENELEC, and the point of interconnection is the Revloc 46 kV substation.

The project's interconnection agreement status is listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Cambria

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

PENELEC

Entity

PJM

Service Type

Point of Interconnection

Revloc 46 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
EBENSBUR13 KV NUG GE
POI Substation
Revloc Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.