PJM-AI1-148
164 MW generation in Kankakee, IL · In queue since September 2022 · Proposed COD January 2026
164 MW
Capacity
1
Components
Solar
3y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
3y 4m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-01-01
PJM-AI1-148 is a proposed solar generation project with a total capacity of 164 MW, located in Kankakee County, Illinois. The project is being developed within the PJM Interconnection queue, with an entry date of September 9, 2022, and a proposed commercial operation date of January 1, 2026. The project is interconnected with ComEd at the Davis Creek 138kV point of interconnection.
The interconnection agreement (IA) for PJM-AI1-148 is currently in progress, with the specific study being conducted not specified in available data. The project consists solely of solar photovoltaic generation, with no battery storage or other generation types included in the listed components.
Generated from interconnection queue and public data sources
State
IL
County
Kankakee
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Davis Creek 138kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- 86 DAVIS138 KV TR71
- POI Substation
- ComEd Davis Creek Substation