Project PJM-AI1-151 — Project Summary

Queue ID
PJM-AI1-151
Capacity
53.2 MW
Technology
Solar
Status
active
Location
Adams, OH
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI1-151

PJM-AI1-151BetaActiveSolarPJMLBNL + Live

53.2 MW generation in Adams, OH · In queue since September 2022 · Proposed COD January 2027

53.2 MW

Capacity

1

Components

Solar

3y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2027

Interconnection

Total Duration

4y 4m

In Study38%
Queue EntrySep 10, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-01-04

About

PJM-AI1-151 is a proposed solar generation project with a total capacity of 53.2 MW, located in Adams County, Ohio. The project is in the PJM interconnection queue, having entered on September 10, 2022, with a proposed commercial operation date of January 4, 2027. The interconnection agreement is currently listed as "In Progress (unknown study)". The interconnecting utility is AEP, and the point of interconnection is the Kyger Creek - Pierce 345 kV line.

The development project consists solely of solar generation, with the 53.2 MW capacity attributed to solar photovoltaic technology. The project is currently listed as "active" within the PJM queue. There has been recent news coverage of the project.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Adams

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Kyger Creek - Pierce 345 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
KYGERCRE15.5 KV KY5

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AI1-151