PJM-AI1-175
19.5 MW hybrid in Marion, OH · In queue since September 2022 · Proposed COD December 2024
19.5 MW
Capacity
1
Components
Solar
3y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
2y 3m
Schedule
16 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-31
PJM-AI1-175 is a proposed solar and battery hybrid project located in Marion County, Ohio. The project, with a total capacity of 19.5 MW, consists of 19.5 MW of solar generation paired with battery storage. Interconnection to the grid is planned through the Waldo - North Waldo 69 kV point of interconnection, managed by AEP within the PJM Interconnection region.
The project entered the PJM interconnection queue on September 9, 2022, with a proposed commercial operation date of December 31, 2024. Its interconnection agreement status is currently listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
OH
County
Marion
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Waldo - North Waldo 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.