Project PJM-AI1-175 — Project Summary

Queue ID
PJM-AI1-175
Capacity
19.5 MW
Technology
Solar+Battery
Status
active
Location
Marion, OH
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI1-175

PJM-AI1-175BetaActiveSolarBatteryPJMLBNL + Live

19.5 MW hybrid in Marion, OH · In queue since September 2022 · Proposed COD December 2024

19.5 MW

Capacity

1

Components

Solar

3y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

2y 3m

Schedule

16 months past proposed COD

In Study38%
Queue EntrySep 9, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-31

About

PJM-AI1-175 is a proposed solar and battery hybrid project located in Marion County, Ohio. The project, with a total capacity of 19.5 MW, consists of 19.5 MW of solar generation paired with battery storage. Interconnection to the grid is planned through the Waldo - North Waldo 69 kV point of interconnection, managed by AEP within the PJM Interconnection region.

The project entered the PJM interconnection queue on September 9, 2022, with a proposed commercial operation date of December 31, 2024. Its interconnection agreement status is currently listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Marion

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Waldo - North Waldo 69 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AI1-175