PJM-AI1-179
100 MW hybrid in Cambria, PA · In queue since September 2022 · Proposed COD December 2027
100 MW
Capacity
1
Components
Solar
3y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
5y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
PJM-AI1-179 is a proposed 100 MW hybrid Solar+Battery project located in Cambria County, Pennsylvania. The project consists of 100 MW of solar capacity. It is listed in the PJM interconnection queue as of September 9, 2022, with a proposed commercial operation date of December 31, 2027. The interconnection agreement (IA) status is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Colver Power Project 115 kV substation.
The proposed project is in the PENELEC utility territory. It is currently listed as "active" in the PJM interconnection queue.
Generated from interconnection queue and public data sources
State
PA
County
Cambria
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
Colver Power Project 115 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AI1-179