Project PJM-AI1-184 — Project Summary

Queue ID
PJM-AI1-184
Capacity
110 MW
Technology
Battery
Status
active
Location
Frederick, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI1-184

PJM-AI1-184BetaActiveBatteryPJMLBNL + Live

110 MW storage in Frederick, VA · In queue since September 2022 · Proposed COD December 2027

110 MW

Capacity

1

Components

Battery

3y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2027

Interconnection

Total Duration

5y 3m

In Study38%
Queue EntrySep 9, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

About

PJM-AI1-184 is a proposed 110 MW battery storage project located in Frederick County, Virginia. The project, which consists entirely of battery storage, is interconnected within the PJM Interconnection queue. Its queue entry date is September 9, 2022, with a proposed commercial operation date of December 31, 2027. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)". The designated point of interconnection (POI) is the Greenwood 138 kV substation.

The project's listed utility is APS, and it is currently in the active stage of the interconnection queue process. Recent news coverage indicates public interest in the development of battery storage projects within the PJM region.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Frederick

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

APS

Entity

PJM

Service Type

Point of Interconnection

Greenwood 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
GREENWOO138 KV GREENWD
POI Substation
Greenwood Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.