PJM-AI1-186
140 MW storage in Shenandoah, VA · In queue since September 2022 · Proposed COD December 2027
140 MW
Capacity
1
Components
Battery
3y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
5y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
PJM-AI1-186 is a proposed 140 MW battery storage project located in Shenandoah County, Virginia. The project is in the PJM interconnection queue as of September 9, 2022, with a proposed commercial operation date of December 31, 2027. The interconnection point is at the Strasburg 138 kV substation. Its interconnection agreement status is listed as "In Progress (unknown study)".
The development project is sponsored by APS. It consists solely of battery storage, with a total capacity of 140 MW.
Generated from interconnection queue and public data sources
State
VA
County
Shenandoah
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Strasburg 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- STRASBUR138 KV T1_AP
- POI Substation
- Strasburg Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.