Project PJM-AI1-213 — Project Summary

Queue ID
PJM-AI1-213
Capacity
174 MW
Technology
Solar+Battery
Status
active
Location
Elk, PA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI1-213

PJM-AI1-213BetaActiveSolarBatteryPJMLBNL + Live

174 MW hybrid in Elk, PA · In queue since September 2022 · Proposed COD June 2024

174 MW

Capacity

1

Components

Solar

3y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

1y 9m

Schedule

22 months past proposed COD

In Study38%
Queue EntrySep 10, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-06-30

About

PJM-AI1-213 is a proposed 174 MW hybrid solar and battery project located in Elk County, Pennsylvania. The project, consisting of 174 MW of solar generation, is in the PJM interconnection queue as of September 10, 2022, with a proposed commercial operation date of June 30, 2024.

The interconnection request, filed under the queue ID PJM-AI1-213, is currently listed as "In Progress (unknown study)". The point of interconnection is the Farmers Valley - Ridgeway 115 kV VI line. The transmission provider is listed as APS within the PJM region.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Elk

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

APS

Entity

PJM

Service Type

Point of Interconnection

Farmers Valley - Ridgeway 115 kV VI

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
VALLEY4 230 KV SR_1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.