Project PJM-AI1-216 — Project Summary

Queue ID
PJM-AI1-216
Capacity
20 MW
Technology
Solar+Battery
Status
active
Location
Centre, PA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI1-216

PJM-AI1-216BetaActiveSolarBatteryPJMLBNL + Live

20 MW hybrid in Centre, PA · In queue since September 2022 · Proposed COD June 2024

20 MW

Capacity

1

Components

Solar

3y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

1y 9m

Schedule

22 months past proposed COD

In Study38%
Queue EntrySep 10, 2022

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-06-30

About

PJM-AI1-216 is a proposed 20 MW hybrid solar and battery project located in Centre County, Pennsylvania. The project, which consists of 20 MW of solar generation, is interconnected within the PJM Interconnection queue. The project entered the queue on September 10, 2022, with a proposed commercial operation date of June 30, 2024. The interconnection agreement status is currently listed as "In Progress (unknown study)".

The proposed point of interconnection is the Philipsburg 115 kV VI substation, and the interconnecting utility is PENELEC. The project is currently listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Centre

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

PENELEC

Entity

PJM

Service Type

Point of Interconnection

Philipsburg 115 kV VI

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
PHILIPSB115 KV UNSH_SP
POI Substation
Philipsburg Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.