Project PJM-AI2-091 — Project Summary

Queue ID
PJM-AI2-091
Capacity
22.7 MW
Technology
Wind
Status
active
Location
Paulding, OH
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI2-091

PJM-AI2-091BetaActiveWindPJMLBNL + Live

22.7 MW generation in Paulding, OH · In queue since March 2023 · Proposed COD February 2023

22.7 MW

Capacity

1

Components

Wind

3y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

3y 2m

Schedule

39 months past proposed COD

In Study38%
Queue EntryMar 2, 2023

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-02-27

About

PJM-AI2-091 is a proposed wind generation project with a total capacity of 22.7 MW. The project is located in Paulding County, Ohio, and interconnects to the PJM Interconnection queue. The queue entry date is March 2, 2023, with a proposed commercial operation date of February 27, 2023. The interconnection agreement status is listed as "In Progress (unknown study)". The designated point of interconnection is the Lincoln-Sterling 138kV line, and the interconnecting utility is AEP.

The development project consists solely of wind generation, with all 22.7 MW of capacity attributed to this technology. The project is currently listed as "active" within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Paulding

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Lincoln-Sterling 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.