PJM-AI2-092
40.3 MW generation in Paulding, OH · In queue since March 2023 · Proposed COD February 2023
40.3 MW
Capacity
1
Components
Wind
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
3y 2m
Schedule
39 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-02-27
The proposed project PJM-AI2-092 is a 40.3 MW wind generation project located in Paulding County, Ohio. The project is interconnected within the PJM Interconnection queue, with American Electric Power (AEP) as the utility. The queue entry date is March 1, 2023, and the proposed commercial operation date is February 27, 2023.
The interconnection agreement (IA) status for the project is listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
OH
County
Paulding
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Logtown 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- Logtown Switching Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AI2-092