PJM-AI2-094
53.5 MW generation in White, IN · In queue since March 2023 · Proposed COD February 2023
53.5 MW
Capacity
1
Components
Wind
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
3y 2m
Schedule
39 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-02-27
PJM-AI2-094 is a proposed wind generation project with a total capacity of 53.5 MW. The project is located in White County, Indiana, and is interconnected within the PJM Interconnection region. The queue entry date for the project is March 1, 2023, with a proposed commercial operation date of February 27, 2023. The Interconnection Agreement (IA) status is currently listed as "In Progress (unknown study)".
The project is being developed within the American Electric Power (AEP) utility territory. The point of interconnection (POI) is the Olive-Dequine 345kV line. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
IN
County
White
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Olive-Dequine 345kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.