PJM-AI2-116
24 MW generation in Allen, IN · In queue since February 2023 · Proposed COD October 2026
24 MW
Capacity
1
Components
Solar
3y 3m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
3y 8m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-10-31
PJM-AI2-116 is a proposed solar generation project with a total capacity of 24 MW, located in Allen County, Indiana. The project is interconnected within the PJM Interconnection queue, having entered the queue on February 28, 2023. The proposed commercial operation date is October 31, 2026. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)". The interconnecting utility is AEP, and the point of interconnection (POI) is the Allen 345kV substation.
The development project consists solely of solar generation, with the 24 MW total capacity attributed to solar photovoltaic (PV) technology.
Generated from interconnection queue and public data sources
State
IN
County
Allen
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Allen 345kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- Allen IM Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AI2-116