Project PJM-AI2-137 — Project Summary

Queue ID
PJM-AI2-137
Capacity
21.6 MW
Technology
Solar
Status
active
Location
Henry, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI2-137

PJM-AI2-137BetaActiveSolarPJMLBNL + Live

21.6 MW generation in Henry, VA · In queue since February 2023 · Proposed COD December 2022

21.6 MW

Capacity

1

Components

Solar

3y 3m

In Queue

In Progress (unknown study)

IA Status

COD target: 2022

Interconnection

Total Duration

3y 3m

Schedule

41 months past proposed COD

In Study38%
Queue EntryFeb 28, 2023

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-12-31

About

PJM-AI2-137 is a proposed solar generation project with a total capacity of 21.6 MW, located in Henry County, Virginia. The project is interconnected within the PJM Interconnection queue, having entered the queue on February 28, 2023. The proposed commercial operation date is December 31, 2022. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)". The interconnecting utility is AEP, and the point of interconnection (POI) is Stockton 138 kV.

The development project consists solely of solar generation, with a capacity of 21.6 MW.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Henry

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Stockton 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
STOCKTON69 KV LOADT2
POI Substation
Stockton Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.