PJM-AI2-177
5.8 MW generation in Dorchester, MD · In queue since February 2023 · Proposed COD July 2021
5.8 MW
Capacity
1
Components
Solar
3y 3m
In Queue
In Progress (unknown study)
IA Status
COD target: 2021
Total Duration
3y 3m
Schedule
58 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-07-31
PJM-AI2-177 is a proposed solar generation project located in Dorchester County, Maryland, within the PJM Interconnection region. The project, with a total capacity of 5.8 MW, consists entirely of solar photovoltaic generation. Its point of interconnection is the Todd 25 kV substation.
The project entered the PJM interconnection queue on February 28, 2023, with a proposed commercial operation date of July 31, 2021. The interconnection agreement status is currently listed as "In Progress (unknown study)". The utility is listed as DPL.
Generated from interconnection queue and public data sources
State
MD
County
Dorchester
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
DPL
Entity
PJM
Service Type
—
Point of Interconnection
Todd 25 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- TODD 25 KV DORCHSP1
- POI Substation
- Todd Substation