PJM-AI2-192
12 MW generation in Champaign, OH · In queue since March 2023 · Proposed COD April 2025
12 MW
Capacity
1
Components
Solar
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
2y 1m
Schedule
13 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-04-15
The proposed project PJM-AI2-192 is a 12 MW solar generation project located in Champaign County, Ohio. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 2, 2023, with a proposed commercial operation date of April 15, 2025. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)".
The project, which is being developed within the Dayton utility territory, consists of 12 MW of solar photovoltaic generation. The point of interconnection (POI) is the Woodstock 69 kV substation.
Generated from interconnection queue and public data sources
State
OH
County
Champaign
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dayton
Entity
PJM
Service Type
—
Point of Interconnection
Woodstock 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- THOMPSCR13 KV TX2
- POI Substation
- Woodstock Substation