PJM-AI2-207
5.35 MW generation in Wicomico, MD · In queue since March 2023 · Proposed COD March 2023
5.35 MW
Capacity
1
Components
Solar
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
<1 month
Schedule
38 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-03-30
PJM-AI2-207 is a proposed solar generation project located in Wicomico County, Maryland. The project, with a total capacity of 5.35 MW, is interconnected to the DPL utility via the Rockawalkin 69 kV point of interconnection.
The project is listed in the PJM interconnection queue with an entry date of March 2, 2023, and a proposed commercial operation date of March 30, 2023. Its interconnection agreement status is currently listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
MD
County
Wicomico
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
DPL
Entity
PJM
Service Type
—
Point of Interconnection
Rockawalkin 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ROCKWLKN69 KV LS-EGRET
- POI Substation
- Rockawalkin Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AI2-207