PJM-AI2-218
43.4 MW generation in Wyandot, OH · In queue since March 2023 · Proposed COD May 2025
43.4 MW
Capacity
1
Components
Solar
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
2y 2m
Schedule
11 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-05-30
PJM-AI2-218 is a proposed solar generation project with a total capacity of 43.4 MW, located in Wyandot County, Ohio. The project is in the PJM interconnection queue, having entered on March 2, 2023, with a proposed commercial operation date of May 30, 2025. The interconnecting utility is AEP.
The project's interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Galion - South Berwick 345 kV line.
Generated from interconnection queue and public data sources
State
OH
County
Wyandot
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Galion - South Berwick 345 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SOUTH
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.