PJM-AI2-220
103.1 MW generation in Erie, OH · In queue since March 2023 · Proposed COD October 2024
103.1 MW
Capacity
1
Components
Wind
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
1y 7m
Schedule
19 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-10-01
PJM-AI2-220 is a proposed wind generation project with a total capacity of 103.1 MW. The project is located in Erie County, Ohio, within the PJM Interconnection region and is being managed by utility ATSI. The project entered the PJM queue on March 2, 2023, with a proposed commercial operation date of October 1, 2024.
The interconnection agreement (IA) for PJM-AI2-220 is currently listed as "In Progress (unknown study)". The point of interconnection (POI) for the project is the Beaver-Davis Besse 345 kV II substation.
Generated from interconnection queue and public data sources
State
OH
County
Erie
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
Beaver-Davis Besse 345 kV II
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AI2-220