PJM-AI2-223
56.4 MW generation in Chowan, NC · In queue since March 2023 · Proposed COD May 2024
56.4 MW
Capacity
1
Components
Wind
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
1y 2m
Schedule
24 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-05-28
PJM-AI2-223 is a proposed wind generation project with a total capacity of 56.4 MW. The project is located in Chowan County, North Carolina, within the Dominion service area. The project entered the PJM interconnection queue on March 2, 2023, with a proposed commercial operation date of May 28, 2024. Its interconnection agreement status is listed as "In Progress (unknown study)".
The proposed project consists of 56.4 MW of wind generation. The point of interconnection is the WinFall-Chowan 230kV line.
Generated from interconnection queue and public data sources
State
NC
County
Chowan
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
WinFall-Chowan 230kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.