Project PJM-AI2-228 — Project Summary

Queue ID
PJM-AI2-228
Capacity
240 MW
Technology
Battery
Status
active
Location
Mchenry, IL
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI2-228

PJM-AI2-228BetaActiveBatteryPJMLBNL + Live

240 MW storage in Mchenry, IL · In queue since March 2023 · Proposed COD November 2024

240 MW

Capacity

1

Components

Battery

3y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

1y 8m

Schedule

18 months past proposed COD

In Study38%
Queue EntryMar 2, 2023

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-11-06

About

PJM-AI2-228 is a proposed 240 MW battery storage project located in McHenry County, Illinois. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 2, 2023. The proposed commercial operation date is November 6, 2024.

The interconnection agreement for the project is currently in progress, with the specific study being conducted unknown. The project is located within the ComEd utility territory and connects to the grid at the Silver Lake 345 kV point of interconnection.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Mchenry

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ComEd

Entity

PJM

Service Type

Point of Interconnection

Silver Lake 345

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
75 CRYST138 KV TR71 12
POI Substation
Silver Lake Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AI2-228