Project PJM-AI2-233 — Project Summary

Queue ID
PJM-AI2-233
Capacity
49.4 MW
Technology
Wind
Status
active
Location
Centre, PA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI2-233

PJM-AI2-233BetaActiveWindPJMLBNL + Live

49.4 MW generation in Centre, PA · In queue since March 2023 · Proposed COD June 2023

49.4 MW

Capacity

1

Components

Wind

3y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

3 months

Schedule

36 months past proposed COD

In Study38%
Queue EntryMar 2, 2023

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-06-01

About

PJM-AI2-233 is a proposed wind generation project with a total capacity of 49.4 MW, located in Centre County, Pennsylvania. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 2, 2023. The proposed commercial operation date is June 1, 2023. The interconnecting utility is PENELEC, and the point of interconnection is Eagle Valley 115kV II. The interconnection agreement status is currently "In Progress (unknown study)".

The development project consists solely of wind generation, with all 49.4 MW of capacity attributed to this technology. The project's status within the PJM queue is listed as active.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Centre

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

PENELEC

Entity

PJM

Service Type

Point of Interconnection

Eagle Valley 115kV II

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
EAGLEVAL34.5 KV SANRI2WF
POI Substation
Eagle Valley Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.