Project PJM-AI2-236 — Project Summary

Queue ID
PJM-AI2-236
Capacity
22.6 MW
Technology
Solar
Status
active
Location
Campbell, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI2-236

PJM-AI2-236BetaActiveSolarPJMLBNL + Live

22.6 MW generation in Campbell, VA · In queue since March 2023 · Proposed COD March 2023

22.6 MW

Capacity

1

Components

Solar

3y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

<1 month

Schedule

39 months past proposed COD

In Study38%
Queue EntryMar 3, 2023

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-03-01

About

PJM-AI2-236 is a proposed solar generation project with a total capacity of 22.6 MW, located in Campbell County, Virginia. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 3, 2023. The proposed commercial operation date is March 1, 2023. The interconnection agreement status is currently listed as "In Progress (unknown study)". The interconnecting utility is AEP, and the point of interconnection is the Smith Mountain - Candler Mountain 138 kV line.

The project consists of 22.6 MW of solar photovoltaic generation. The developer is not specified in the queue data. The project's interconnection agreement is currently in progress, but the specific study being conducted is not identified.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Campbell

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Smith Mountain - Candler Mountain 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.