PJM-AI2-294
52.9 MW generation in Randolph, WV · In queue since March 2023 · Proposed COD January 2028
52.9 MW
Capacity
1
Components
Wind
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2028
Total Duration
4y 10m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-01-01
PJM-AI2-294 is a proposed wind generation project located in Randolph County, West Virginia, with a total capacity of 52.9 MW. The project is being developed within the PJM Interconnection queue and was entered on March 3, 2023. The proposed commercial operation date is January 1, 2028.
The interconnection agreement for PJM-AI2-294 is currently in progress, with the specific study type unknown. The project is interconnected to the APS system at the Laurel Mountain 138 kV point of interconnection.
Generated from interconnection queue and public data sources
State
WV
County
Randolph
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Laurel Mountain 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.