Project PJM-AI2-300 — Project Summary

Queue ID
PJM-AI2-300
Capacity
6.36 MW
Technology
Solar
Status
active
Location
Pasquotank, NC
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI2-300

PJM-AI2-300BetaActiveSolarPJMLBNL + Live

6.36 MW generation in Pasquotank, NC · In queue since March 2023 · Proposed COD October 2021

6.36 MW

Capacity

1

Components

Solar

3y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2021

Interconnection

Total Duration

3y 2m

Schedule

55 months past proposed COD

In Study38%
Queue EntryMar 3, 2023

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2021-10-18

About

PJM-AI2-300 is a proposed solar generation project with a total capacity of 6.36 MW. The project is located in Pasquotank County, North Carolina, within the Dominion service area. It is interconnected to the PJM Interconnection queue as of March 3, 2023, with a proposed commercial operation date of October 18, 2021. The interconnection agreement status is listed as "In Progress (unknown study)".

The proposed project consists of 6.36 MW of solar photovoltaic generation. Its point of interconnection (POI) is the Elizabeth City 34.5 kV substation. The project is currently listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

NC

County

Pasquotank

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Elizabeth City 34.5 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.