PJM-AI2-327
19.91 MW generation in Metcalfe, KY · In queue since March 2023 · Proposed COD October 2023
19.91 MW
Capacity
1
Components
Solar
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
7 months
Schedule
31 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-10-15
PJM-AI2-327 is a proposed solar generation project with a total capacity of 19.91 MW, located in Metcalfe County, Kentucky. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 2, 2023. The proposed commercial operation date is October 15, 2023. The interconnecting utility is EKPC.
The project's interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Patton Rd-Summer Shade 69 kV line.
Generated from interconnection queue and public data sources
State
KY
County
Metcalfe
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Patton Rd-Summer Shade 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.