Project PJM-AI2-355 — Project Summary

Queue ID
PJM-AI2-355
Capacity
103.8 MW
Technology
Wind
Status
active
Location
Grant, WV
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI2-355

PJM-AI2-355BetaActiveWindPJMLBNL + Live

103.8 MW generation in Grant, WV · In queue since March 2023 · Proposed COD April 2023

103.8 MW

Capacity

1

Components

Wind

3y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

1 month

Schedule

38 months past proposed COD

In Study38%
Queue EntryMar 3, 2023

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-04-03

About

PJM-AI2-355 is a proposed wind generation project with a total capacity of 103.8 MW. The project is located in Grant County, West Virginia, within the PJM Interconnection region. The queue entry date is March 3, 2023, with a proposed commercial operation date of April 3, 2023. The interconnection agreement status is listed as "In Progress (unknown study)". The designated point of interconnection is the Greenland Gap 500 kV substation.

The project is being developed within the service territory of utility APS. It consists of 103.8 MW of wind generation capacity. The project is currently listed as active in the PJM interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

WV

County

Grant

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

APS

Entity

PJM

Service Type

Point of Interconnection

Greenland Gap 500 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
GREENGAP35 KV G1
POI Substation
Greenland Gap Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.