57.2 MW generation in Grant, WV · In queue since March 2023 · Proposed COD July 2027
57.2 MW
Capacity
1
Components
Wind
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-07-31
PJM-AI2-356 is a proposed wind generation project with a total capacity of 57.2 MW. The project is located in Grant County, West Virginia, within the PJM Interconnection region. The queue entry date is March 4, 2023, with a proposed commercial operation date of July 31, 2027. The interconnecting utility is APS.
The project's interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Greenland Gap 500 kV II substation.
Generated from interconnection queue and public data sources
State
WV
County
Grant
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Greenland Gap 500 kV II
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- GREENGAP35 KV G1
- POI Substation
- Greenland Gap Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AI2-356