Project PJM-AI2-359 — Project Summary

Queue ID
PJM-AI2-359
Capacity
13.1 MW
Technology
Wind
Status
active
Location
Mineral, WV
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI2-359

PJM-AI2-359BetaActiveWindPJMLBNL + Live

13.1 MW generation in Mineral, WV · In queue since March 2023 · Proposed COD April 2023

13.1 MW

Capacity

1

Components

Wind

3y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

1 month

Schedule

38 months past proposed COD

In Study38%
Queue EntryMar 4, 2023

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-04-03

About

PJM-AI2-359 is a proposed wind generation project with a total capacity of 13.1 MW. The project is located in Mineral County, West Virginia, and is being developed within the PJM Interconnection region. The project entered the PJM queue on March 4, 2023, with a proposed commercial operation date of April 3, 2023. The interconnection agreement status is currently listed as "In Progress (unknown study)".

The proposed project is to be interconnected to the APS utility grid at the Cross School 138 kV point of interconnection. The project consists of 13.1 MW of wind generation capacity.

Generated from interconnection queue and public data sources

Project Details

State

WV

County

Mineral

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

APS

Entity

PJM

Service Type

Point of Interconnection

Cross School 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AI2-359