PJM-AI2-383
26.29 MW generation in Centre, PA · In queue since March 2023 · Proposed COD December 2024
26.29 MW
Capacity
1
Components
Solar
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
1y 9m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-01
PJM-AI2-383 is a proposed solar generation project located in Centre County, Pennsylvania, with a total capacity of 26.29 MW. The project is being developed within the PJM Interconnection queue and was entered on March 4, 2023. The proposed commercial operation date is December 1, 2024.
The interconnection agreement (IA) status for PJM-AI2-383 is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is the Moshannon-Milesburg 230 kV X transmission line. The utility associated with the project is APS.
Generated from interconnection queue and public data sources
State
PA
County
Centre
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Moshannon-Milesburg 230 kV X
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AI2-383