Project PJM-AI2-407 — Project Summary

Queue ID
PJM-AI2-407
Capacity
31.2 MW
Technology
Solar
Status
active
Location
Hancock, OH
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI2-407

PJM-AI2-407BetaActiveSolarPJMLBNL + Live

31.2 MW generation in Hancock, OH · In queue since March 2023 · Proposed COD December 2025

31.2 MW

Capacity

1

Components

Solar

3y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

2y 9m

Schedule

4 months past proposed COD

In Study38%
Queue EntryMar 2, 2023

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-31

About

PJM-AI2-407 is a proposed solar generation project with a total capacity of 31.2 MW. The project is located in Hancock County, Ohio, within the PJM Interconnection region and is being managed by utility AEP. The project entered the PJM queue on March 2, 2023, with a proposed commercial operation date of December 31, 2025.

The interconnection agreement for PJM-AI2-407 is currently listed as "In Progress (unknown study)". The point of interconnection is the Fostoria Central 138 kV substation. The project is listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Hancock

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Fostoria Central 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
WEFOSTOR69 KV T1
POI Substation
Fostoria Central Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AI2-407