PJM-AI2-407
31.2 MW generation in Hancock, OH · In queue since March 2023 · Proposed COD December 2025
31.2 MW
Capacity
1
Components
Solar
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
2y 9m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-31
PJM-AI2-407 is a proposed solar generation project with a total capacity of 31.2 MW. The project is located in Hancock County, Ohio, within the PJM Interconnection region and is being managed by utility AEP. The project entered the PJM queue on March 2, 2023, with a proposed commercial operation date of December 31, 2025.
The interconnection agreement for PJM-AI2-407 is currently listed as "In Progress (unknown study)". The point of interconnection is the Fostoria Central 138 kV substation. The project is listed as active in the interconnection queue.
Generated from interconnection queue and public data sources
State
OH
County
Hancock
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Fostoria Central 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- WEFOSTOR69 KV T1
- POI Substation
- Fostoria Central Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.