PJM-AI2-455
162.8 MW generation in Union, PA · In queue since March 2023 · Proposed COD March 2023
162.8 MW
Capacity
1
Components
Wind
3y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
<1 month
Schedule
38 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-03-31
PJM-AI2-455 is a proposed wind generation project located in Union County, Pennsylvania, within the PJM Interconnection region. The project, with a total capacity of 162.8 MW, consists entirely of wind turbines. Its interconnection request was entered into the PJM queue on March 11, 2023, with a proposed commercial operation date of March 31, 2023.
The interconnection agreement (IA) status for PJM-AI2-455 is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is W4-005 345kV (CIR Increase). The listed utility is ComEd.
Generated from interconnection queue and public data sources
State
PA
County
Union
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
W4-005 345kV (CIR Increase)
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AI2-455