PSE-56
100.6 MW generation in Douglas, WA · In queue since January 2018 · Proposed COD December 2023
100.6 MW
Capacity
1
Components
Solar
8y 4m
In Queue
Suspended
IA Status
COD target: 2023
Total Duration
5y 11m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PSE-56 is a proposed solar generation project with a total capacity of 100.6 MW, located in Douglas County, Washington. The project is being developed within the Puget Sound Energy (PSE) service area. It consists of 100.6 MW of solar photovoltaic generation.
The project is listed in the Puget Sound Energy interconnection queue as of January 8, 2018, with a proposed commercial operation date of December 31, 2023. Its interconnection agreement status is currently listed as suspended. The point of interconnection is the Cascade - Rocky Reach 230kV Line.
Generated from interconnection queue and public data sources
State
WA
County
Douglas
Grid Region
Mountain West
Market
—
Developer
—
Utility
Puget Sound Energy
Entity
PSE
Service Type
—
Point of Interconnection
Cascade - Rocky Reach 230kV Line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.