S-C-167
74.99 MW generation in Darlington, SC · In queue since October 2021 · Proposed COD September 2025
74.99 MW
Capacity
1
Components
Solar
4y 7m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
3y 11m
Schedule
8 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-09-01
A proposed solar generation project with queue ID S-C-167, totaling 74.99 MW, is under development in Darlington County, South Carolina. The project, located in the Southeast region, is being managed within the Santee Cooper (S-C) interconnection queue. The queue entry date is October 26, 2021, with a proposed commercial operation date of September 1, 2025.
The interconnection agreement (IA) for the project is currently in progress, with the specific study type not specified in available data. The project consists of 74.99 MW of solar photovoltaic generation capacity.
Generated from interconnection queue and public data sources
State
SC
County
Darlington
Grid Region
Southeast
Market
—
Developer
—
Utility
Santee Cooper
Entity
S-C
Service Type
—
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.