74.5 MW generation in Darlington, SC · In queue since June 2024 · Proposed COD December 2027
74.5 MW
Capacity
1
Components
Solar
1y 11m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
3y 6m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
S-C-274 is a proposed solar generation project with a total capacity of 74.5 MW, located in Darlington County, South Carolina. The project is being developed within the Santee Cooper (S-C) interconnection queue, with an entry date of June 5, 2024. The proposed commercial operation date is December 31, 2027.
The interconnection agreement for S-C-274 is currently listed as "In Progress (unknown study)". The project has appeared in recent news coverage regarding solar development in the Southeast region.
Generated from interconnection queue and public data sources
State
SC
County
Darlington
Grid Region
Southeast
Market
—
Developer
—
Utility
Santee Cooper
Entity
S-C
Service Type
—
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project S-C-274