Project SPP-ERAS-2025-030 — Project Summary

Queue ID
SPP-ERAS-2025-030
Capacity
350 MW
Technology
Solar+Battery
Status
active
Location
Roswell, NM
Region
SPP
Developer
IA Status

SPP-ERAS-2025-030

SPP-ERAS-2025-030BetaActiveHybrid / Solar/StorageSPPLive · SPP

350 MW generation in Roswell, NM · In queue since October 2025

350 MW

Capacity

0

Components

7 months

In Queue

IA Status

Interconnection

Total Duration

7 months

Pre-Study0%
Queue EntryOct 2, 2025

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

SPP-ERAS-2025-030 is a proposed 350 MW solar and battery hybrid project located in Roswell, Chaves County, New Mexico. The project, which appeared in the Southwest Power Pool (SPP) interconnection queue on October 2, 2025, is designated as an Energy Resource/Network Resource (ER/NR) service type. The point of interconnection (POI) is at the G24-279 New Switch Station, tying into the Chaves - Eddy County 230 kV line.

The project is currently listed as active within the SPP queue and is being developed within the service territory of Southwestern Public Service (SPS). The technology is classified as a hybrid solar/storage facility.

Generated from interconnection queue and public data sources

Project Details

State

NM

County

Roswell

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

Utility

SPS

Entity

SPP

Service Type

ER/NR

Point of Interconnection

G24-279 New Switch Station tying into Chaves - Eddy County 230 kV Line

Data Source

Live · SPP

Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
POI Substation
New Holstein Switch Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project SPP-ERAS-2025-030