SPP-ERAS-2025-033
150 MW generation in Dodge City, KS · In queue since October 2025
150 MW
Capacity
0
Components
7 months
In Queue
—
IA Status
Total Duration
7 months
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-ERAS-2025-033 is a proposed 150 MW solar and battery hybrid project located in Dodge City, Kansas. The project consists of both solar photovoltaic generation and battery energy storage, though the individual capacities of each component are not specified. The project is listed in the Southwest Power Pool (SPP) interconnection queue, having entered the queue on October 1, 2025.
The proposed project's point of interconnection (POI) is the Fort Dodge 115 kV Substation. The project is seeking Energy Resource / Network Resource (ER/NR) service from Sunflower Electric Power Corporation (SEPC). As of the latest data, the project's status in the SPP queue is listed as active.
Generated from interconnection queue and public data sources
State
KS
County
Dodge City
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
SEPC
Entity
SPP
Service Type
ER/NR
Point of Interconnection
Fort Dodge 115 kV Substation
Data Source
Live · SPP
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project SPP-ERAS-2025-033