Project SPP-ERAS-2025-033 — Project Summary

Queue ID
SPP-ERAS-2025-033
Capacity
150 MW
Technology
Solar+Battery
Status
active
Location
Dodge City, KS
Region
SPP
Developer
IA Status

SPP-ERAS-2025-033

SPP-ERAS-2025-033BetaActiveHybrid / Solar/StorageSPPLive · SPP

150 MW generation in Dodge City, KS · In queue since October 2025

150 MW

Capacity

0

Components

7 months

In Queue

IA Status

Interconnection

Total Duration

7 months

Pre-Study0%
Queue EntryOct 1, 2025

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

SPP-ERAS-2025-033 is a proposed 150 MW solar and battery hybrid project located in Dodge City, Kansas. The project consists of both solar photovoltaic generation and battery energy storage, though the individual capacities of each component are not specified. The project is listed in the Southwest Power Pool (SPP) interconnection queue, having entered the queue on October 1, 2025.

The proposed project's point of interconnection (POI) is the Fort Dodge 115 kV Substation. The project is seeking Energy Resource / Network Resource (ER/NR) service from Sunflower Electric Power Corporation (SEPC). As of the latest data, the project's status in the SPP queue is listed as active.

Generated from interconnection queue and public data sources

Project Details

State

KS

County

Dodge City

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

Utility

SEPC

Entity

SPP

Service Type

ER/NR

Point of Interconnection

Fort Dodge 115 kV Substation

Data Source

Live · SPP

Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.