SPP-GEN-2010-015
200.1 MW generation in Hodgeman, KS · In queue since March 2010
200.1 MW
Capacity
1
Components
Wind
16y 2m
In Queue
Withdrawn
IA Status
Total Duration
16y 2m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2010-015 is a proposed wind generation project with a total capacity of 200.1 MW. The project is located in Hodgeman County, Kansas, and interconnects within the Southwest Power Pool (SPP) RTO region. The interconnection request was entered into the SPP queue on March 31, 2010. The point of interconnection is the Spearville 345kV substation.
The project's interconnection agreement (IA) status is listed as Withdrawn. The listed utility is Sunflower Electric Power Corporation (SUNC).
Generated from interconnection queue and public data sources
State
KS
County
Hodgeman
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
SUNC
Entity
SPP
Service Type
—
Point of Interconnection
Spearville 345kV
Data Source
LBNL + Live
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SECI.KCPS.SPEARVILLE3
- POI Substation
- Spearville Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project SPP-GEN-2010-015