SPP-GEN-2012-027
136 MW generation in Osage, OK · In queue since September 2012
136 MW
Capacity
1
Components
Wind
13y 8m
In Queue
Withdrawn
IA Status
Total Duration
13y 8m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
SPP-GEN-2012-027 is a proposed wind generation project with a total capacity of 136 MW. The project is located in Osage County, Oklahoma, within the Southwest Power Pool (SPP) region. The interconnection request was entered into the SPP queue on September 28, 2012. The Point of Interconnection (POI) is at the Shidler 138kV substation.
The project's interconnection status is currently listed as "active," although the Interconnection Agreement (IA) has been withdrawn. The transmission utility is AEP.
Generated from interconnection queue and public data sources
State
OK
County
Osage
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
SPP
Service Type
—
Point of Interconnection
Shidler 138kV
Data Source
LBNL + Live
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- HIGH
- POI Substation
- Shidler Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.