SPP-GEN-2013-030
300 MW generation in Ochiltree, TX · In queue since September 2013 · Proposed COD December 2020
300 MW
Capacity
1
Components
Wind
12y 8m
In Queue
Withdrawn
IA Status
COD target: 2020
Total Duration
7y 3m
Schedule
65 months past proposed COD
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2020-12-31
SPP-GEN-2013-030 is a proposed wind generation project with a total capacity of 300 MW. The project is located in Ochiltree County, Texas, and falls within the Southwest Power Pool (SPP) region. The interconnection customer is OGE. The project entered the SPP interconnection queue on September 30, 2013, with a proposed commercial operation date of December 31, 2020. Its interconnection agreement (IA) status is listed as Withdrawn.
The point of interconnection (POI) for the project is the Hitchland-Woodward EHV Double Circuit (Beaver County) 345kV line. The project consists of 300 MW of wind generation capacity. The project's status is listed as active in the interconnection queue.
Generated from interconnection queue and public data sources
State
TX
County
Ochiltree
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
OGE
Entity
SPP
Service Type
—
Point of Interconnection
Hitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV
Data Source
LBNL + Live
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project SPP-GEN-2013-030