SPP-GEN-2014-003
15.8 MW generation in Blaine, OK · In queue since February 2014 · Proposed COD December 2014
15.8 MW
Capacity
1
Components
Wind
12y 3m
In Queue
Withdrawn
IA Status
COD target: 2014
Total Duration
10 months
Schedule
138 months past proposed COD
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2014-12-31
SPP-GEN-2014-003 is a proposed wind generation project located in Blaine County, Oklahoma, within the Southwest Power Pool (SPP) region. The project, with a total capacity of 15.8 MW, consists entirely of wind generation. The interconnecting utility is Oklahoma Gas & Electric (OGE).
The project entered the SPP interconnection queue on February 19, 2014, with a proposed commercial operation date of December 31, 2014. Its interconnection agreement (IA) status is listed as Withdrawn. The point of interconnection (POI) is the Tatonga 345kV substation.
Generated from interconnection queue and public data sources
State
OK
County
Blaine
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
OGE
Entity
SPP
Service Type
—
Point of Interconnection
Tatonga 345kV
Data Source
LBNL + Live
- ISO / RTO
- SPP
- Trading Hub
- SPP South Hub
- Hub Confidence
- HIGH
- POI Substation
- Tatonga Substation